Facebook

500

+
Projects

70

+
Countries

10

+
Years Experience

2000

+
Sets / Month

Modular Building Solutions for All Scenarios

Remote mining sites, emergency medical hubs, government resettlement zones, schools and hospitality developments. 9STATES turns tight schedules and complex site conditions into finished, liveable modular buildings. Explore our global track record across 6 core application scenarios.

01 ENGINEERING CAMPS

Mining Camps / Oil & Gas Camps / Construction Camps / EPC Projects

02 MODULAR HOTELS & APARTMENTS

Modular Hotels / Staff Apartments / Serviced Apartments

03 GOVERNMENT HOUSING

Resettlement Housing / Emergency Housing / Affordable Housing

04 INDUSTRIAL & COMMERCIAL

Site Offices / Industrial Buildings / Commercial Facilities

05 MODULAR SCHOOL & CLASSROOMS

Classrooms / School Buildings / Educational Facilities

06 MODULAR MEDICAL & CLINIC

Clinics / Medical Centers / Healthcare Facilities

Projects Across 70+ Countries

From Southeast Asia to the Middle East, Africa and beyond, 9STATES has supplied modular houses, worker camps, dormitories, schools, clinics and storage solutions to customers in more than 70 countries. Backed by our headquarters in Shanghai, production base in Suzhou and Saudi Arabia and branch in Indonesia, we combine dependable manufacturing with fast, local support for projects wherever they are located.

Detachable container appartement for Shanghai workers' isolation dormitory
A 4-year repeat customer from Indonesia ordered 56 quick-assembly container dormitory units for their mining workers in East Kalimantan. Each unit (3×6×2.8m) features PVC flooring, rock wool insulated exterior walls, and EPS waterproof bathroom panels—tailored for tropical mining camp conditions.
Singapore containerHotel Apartment house nurse building. The project consists of 88units 3m*9m*2.8m(L*W*H) detacheabl container house, including walkways, asphalt tile roofs, fire panels, fire doors, aluminum Windows, and smart locks.The project has high requirements and high standards, and the materials have passed the Singapore COC certification. From raw material processing to installation completion, through the Singapore government acceptance, it has been completed successfully after more t
A fourth-year client's new project in East Kalimantan: 52 quick-assembly container units for a workforce dormitory, shipped in four 40HQ containers. Seven days in production, fifteen days in transit, and bathrooms finished in the factory so the wet trades never reach the site.
A 294-bed workforce camp for a coal mine in Kalimantan, delivered from 213 quick-assembly container units. 18 days in production, 17 x 40HQ shipped, 30 days on site — including reinforced packing for a multi-leg route and raised bathroom platforms for drainage.

Mexico Container House Dormitory: 40 Units for Aerial-Equipment Engineers

A 40-unit container house dormitory for aerial-equipment technicians in Nuevo León, Mexico, delivered August 2025. Fully fitted with bathroom, kitchen, bunk beds and water heater — inspected with micrometer calipers before shipment, and supervised on site by a 9STATES technical director.
READ MORE

From Manufacturing to On-Site Delivery

We help clients build solid, fast modular accommodation, ready for sudden project demands, tough site environments and tight deadlines.
Talk To Us

01

Engineering
Deliver reliable structural design and technical support for modular buildings

02

Consulting
Deliver site planning and project advisory for prefab housing solutions

03

Scale
Support large-volume production and phased shipment for big camp projects

04

Talent
Deliver skilled installation & technical service for on-site execution