Facebook

Industry News

From -20°C to 48°C: 9States' 400-Bed Desert Camp for Uzbekistan's Gold Mine, Delivered via the China-Central Asia Railway
2026-06-27
9States delivers a 400-bed flat-pack modular camp for a gold mining project in Uzbekistan Navoi region designed for the extreme continental desert climate of the Kyzylkum Desert with rail logistics via the China-Central Asia railway corridor.
9States Delivers 500-Bed Modular Mining Camp for Zambia's Copperbelt Expansion
2026-06-26
9States delivers a 500-bed flat-pack modular mining camp for Zambia's Copperbelt copper mine expansion. Customized for subtropical highland climate with elevated chassis, C3 corrosion protection, and rapid deployment within 12 weeks.
600-Bed Modular Camp for Vale's Copper Expansion in the Brazilian Amazon
2026-06-25
9States delivers a 600-bed flat-pack modular worker camp for Vale's Carajás copper mine expansion in Pará, Brazil. Designed for tropical rainforest conditions — 38°C heat, 2,000mm rainfall, 85% humidity. Delivered in 3.5 months.
Welcome to Partner on Saudi and Middle East Construction Camps - 12+ Proven Cases Full Range of Layouts
2026-06-24
9States delivers modular prefabricated worker camps for Saudi Arabia and the Middle East. 12+ proven cases covering NEOM, Red Sea, Dammam, Jeddah, and more. Full range of layouts from labor dormitories to management suites. One-stop factory-to-site delivery. Partnerships and subcontracting welcome.
800-Person Modular Worker Camp for Mongolia Copper-Gold Mine — South Gobi Extreme Cold Solution
2026-06-23
A modular accommodation camp built for 800 workers at a copper-gold mine in Mongolia's South Gobi desert, withstanding -35°C temperatures and delivered in 82 days.
Building a Worker Camp at 3,000 Meters — Chile's High-Altitude Mining Accommodation Challenge
2026-06-22
How 9States delivered an 800-bed modular worker camp for a copper mining project in Chile's Atacama Desert, overcoming extreme temperature swings, sand infiltration, and 1,300 km of remote logistics.
Kazakhstan Mining Camp: Building a 300-Bed Modular Camp in -40°C Winters
2026-06-21
Discover how 9States delivered a 300-bed modular mining camp in East Kazakhstan, engineered for -40°C winters with flat-pack container homes. 100mm polyurethane insulation, triple-glazed windows and frost-proof foundations.
Modular Worker Camp for Saudi Arabia's Phosphate Mining Expansion
2026-06-20
A detailed case study of 9States' 1,200-worker modular accommodation camp delivered for Saudi Arabia's Phosphate 3 project in Waad Al Shamal, Northern Borders Province. Designed to withstand extreme desert conditions with enhanced insulation, sand seals, and UV protection.
Go to page