Facebook

Industry News

Dry Riverbed to Dinner Hall: Building a 600-Bed Camp for a Copper Mine in Chihuahua, Mexico
2026-07-16
A copper mine in Chihuahua needed a 600-bed camp ready in 70 days. Flat-pack assembly in desert conditions, PVDF coating against sand abrasion.
High Altitude, Thin Walls? 70 Days to Build a Silver Mine Camp That Works at 2,400m
2026-07-16
How a flat-pack modular camp delivered 600 beds in 70 days for a silver mine expansion in Zacatecas, Mexico — climate-adapted design for 2,400m altitude, PVDF coating, double-layer roof, and 75mm rock wool insulation.
600-Bed Modular Worker Camp for Argentina's Salta Lithium Project - High-Altitude Camp Solution for the Puna Plateau
2026-07-14
9States delivers a 600-bed folding container camp for a lithium mine in Argentina's Salta province.
Chinese Manufacturers Are Heading Overseas -- The Story Behind an 800-Person Camp at Grasberg
2026-07-13
As Chinas manufacturers go global, 9States shares the story of an 800-person modular camp for Indonesias Grasberg copper-gold mine
China's Prefab Housing Export Boom: Mining Camps Are the Strongest Buyers — 9States' Global Practice
2026-07-12
China's prefab home exports tripled in a decade to .3B in 2025, growing 45% in Q1 2026. Behind the boom, mining camps are the strongest buyers. 9States shares how modular construction delivers turnkey worker accommodation across seven climate zones worldwide.
From 35°C Summers to -5°C Winters: How 9States' 500-Bed Modular Camp Handles Bushveld's Temperature Swings
2026-07-10
9States delivers a 500-bed modular worker camp for a Bushveld platinum mine in South Africa. Designed for high-altitude conditions with 75mm polyurethane insulation, UV-resistant coating, lightning protection, backup power, and a 35-day on-site assembly.
600-Bed Modular Worker Camp for a Gold Mine in Ghana's Western Region — Tropical Climate Accommodation Solution for West African Mining
2026-07-09
9States delivered a 600-person modular worker camp for a gold mine in Ghana's Western Region — tropical rainforest climate adaptation, folding container design, full camp facilities, delivered in 42 days.
Modular Worker Camp for Vietnam's Bac Giang Electronics Hub — 500-Person Tropical Climate Accommodation Delivered in 42 Days
2026-07-08
How 9States delivered a 500-worker modular camp for a major electronics industrial park in Bac Giang Province, Vietnam. Tropical climate design with advanced moisture-proofing, drainage, and typhoon-resistant features. 42-day installation, 4,800 m² total building area.
Go to page